1 Harrison St
San Francisco, CA 94105·APN 3769002A
Location
Property Details
- APN
- 3769002A
- Year Built
- 1918
- Lot Area
- 29,124 sqft
- Building Area
- 161,650 sqft
- Units
- 0
- Use Code
- Commercial Office
- Zoning
- RH DTR
- Neighborhood
- Financial District/South Beach
- Last Sale
- Feb 9, 2023
County records
Tax history
18 years of history| Roll Year | Land | Improvements | Total Assessed | Exemptions |
|---|---|---|---|---|
| 2024 | $48,500,000 | $32,300,000 | $80,800,000 | $0 |
| 2023 | $38,410,063 | $26,739,307 | $65,149,370 | $0 |
| 2022 | $37,656,925 | $26,215,007 | $72,040,082 | $0 |
| 2021 | $36,918,554 | $25,700,988 | $72,032,521 | $0 |
| 2020 | $36,540,000 | $25,437,456 | $61,977,456 | $0 |
| 2019 | $35,823,530 | $24,938,683 | $71,163,999 | $0 |
| 2018 | $35,121,108 | $24,449,690 | $65,102,777 | $0 |
| 2017 | $34,432,459 | $23,970,285 | $63,538,734 | $0 |
| 2016 | $33,757,313 | $23,500,280 | $61,820,035 | $0 |
| 2015 | $33,250,247 | $23,147,284 | $61,099,074 | $0 |
| 2014 | — | — | — | $0 |
| 2013 | $32,451,591 | $22,591,297 | $57,799,286 | $0 |
| 2012 | $31,815,286 | $22,148,331 | $57,101,422 | $0 |
| 2011 | $31,191,457 | $21,714,050 | $56,500,110 | $0 |
| 2010 | $30,958,341 | $21,551,767 | $56,597,299 | $0 |
| 2009 | $31,031,887 | $21,602,966 | $57,407,619 | $0 |
| 2008 | $30,423,419 | $21,179,379 | $58,500,625 | $0 |
| 2007 | $29,826,882 | $20,764,098 | $50,590,980 | $0 |
Tax bill history
Coming soon. We'll show paid / unpaid / delinquent status per installment once tax bill ingestion is enabled.
Building permits
342 permits on file- Apr 13, 2026$1Buildingissued
revision to 202410082583 and 202507020012. update 5 columns at level 1 from frp strengthening to steel tube strengthening.
- Mar 20, 2026$19,160Buildingissued
install (40) evacuation maps on all levels
- Mar 20, 2026$2,000Buildingissued
fabricate and install (1) non-illuminated wall mounted sign.
- Mar 20, 2026$12,000Buildingissued
fabricate and install (1) internally face illuminated canopy sign. connecting to power source w/ dedicated 20amp circuit, and astronomical timer
- Mar 17, 2026$20,000Buildingissued
defferred green living wall submission associated with approved pa #202410173107
- Feb 24, 2026—Plumbingissued
work category: 5p; levels 1-6 (typ.): core rr ada wc shifts only. re-install core rr trim. level 1: install waste, vent, dcw for (4) new lavatories, (1) lobby sink with backflow for "green wall". re-install shower trim. install storm drains for canopy. level 4: install waste, vent, dcw for (1) breakroom sink. install (1) backflow at breakroom. level 5: install ng for firepit on level 6. install storm drains for new deck drains on level 6. install (1) backflow for irrigation. level 6: install storm drain for new roof drains. install waste, vent, dcw for (1) breakroom sink, (1) bar sink, (1) gnr, (1) df, (1) bottle fill station. install (2) backflow at breakroom / bar.
- Feb 24, 2026$20,000Electricalissued
restroom upgrades, core and shell fire alarm updates.
- Feb 24, 2026$20,000Electricalissued
restroom upgrades, core and shell fire alarm updates.
- Feb 24, 2026$20,000Electricalissued
restroom upgrades, core and shell fire alarm updates.
- Feb 24, 2026$50,000Electricalissued
lobby renovation including installation of floor boxes and turnstiles, fire alarm system updates, and lighting upgrades.
- Feb 24, 2026$50,000Electricalissued
basement electrical reinstallation, fire alarm modifications, and lighting reinstallation.
- Feb 19, 2026$10,000Buildingissued
defferred exterior metal framing assocated with approved pa 202410173107.
- Feb 10, 2026$5,000Electricalissued
power to (1) exterior sign for illumination.
- Feb 9, 2026$0Plumbingissued
work category: 5m; levels 1,6, roof tenant improvement installation of ductwork, mechanical piping, vav boxes, grd, and fsds. additionally, there is a building electrification involving ashps, hhw pumps, expansion tank, buffer tank, chemical pot feeder, air separator, and vfds.
- Feb 9, 2026$0Plumbingissued
work category: 5m; level 4 tenant improvement installation of ductwork, mechanical piping, vav boxes, grd, and fsds. additionally, there is a building electrification involving ashps, hhw pumps, expansion tank, buffer tank, chemical pot feeder, air separator, and vfds.
- Feb 9, 2026$120,100Buildingissued
installation of new errc sytem.fire only.reference bpa#202410173107.
- Feb 6, 2026$1Buildingfiled
deferred fire alarm submission associated with approved pa#2024-1017-3107
- Dec 23, 2025$1Buildingissued
defferred curtainwall: structural only submission assocated with approved pa 202410173107
- Dec 19, 2025$0Plumbingissued
1/f and 6/f: fire sprinkler t.i
- Dec 19, 2025$129,000Buildingissued
phase 3 - 1/f & 6/f and core: fire sprinkler for t.i. 202410173107.
About this record