383 Bush St
San Francisco, CA 94108·APN 0288017
Summary
Built in 1907, the Commercial Office located at 383 Bush St, San Francisco, CA 94108 sits within the Financial District/South Beach neighborhood on a 1,615 sqft lot. The property features a building size of 15,682 sqft and is zoned C-3-O. Its current total assessed value for 2024 is $2,668,096, comprising $690,064 in land value and $1,978,032 in improvements. Recent activity includes a complete building otc alterations permit issued on March 10, 2023, with a valuation of $24,185 for fire alarm and sprinkler system installations.
Location
Property Details
- APN
- 0288017
- Year Built
- 1907
- Lot Area
- 1,615 sqft
- Building Area
- 15,682 sqft
- Units
- 0
- Use Code
- Commercial Office
- Zoning
- C-3-O
- Neighborhood
- Financial District/South Beach
County records
Tax history
18 years of history| Roll Year | Land | Improvements | Total Assessed | Exemptions |
|---|---|---|---|---|
| 2024 | $690,064 | $1,978,032 | $2,668,096 | $0 |
| 2023 | $676,534 | $1,939,248 | $2,615,782 | $0 |
| 2022 | $663,269 | $1,901,224 | $2,564,493 | $0 |
| 2021 | $650,264 | $1,863,946 | $2,514,210 | $0 |
| 2020 | $643,597 | $1,844,834 | $2,488,431 | $0 |
| 2019 | $630,978 | $1,808,661 | $2,439,639 | $0 |
| 2018 | $618,606 | $1,773,198 | $2,391,804 | $0 |
| 2017 | $606,477 | $1,738,430 | $2,344,907 | $0 |
| 2016 | $594,586 | $1,704,344 | $2,298,930 | $0 |
| 2015 | $585,655 | $1,678,744 | $2,264,399 | $0 |
| 2014 | — | — | — | $0 |
| 2013 | $571,588 | $1,638,422 | $2,214,267 | $0 |
| 2012 | $560,381 | $1,606,297 | $2,173,635 | $0 |
| 2011 | $549,394 | $1,574,801 | $2,131,152 | $0 |
| 2010 | $545,289 | $1,563,033 | $2,115,279 | $0 |
| 2009 | $546,584 | $1,566,746 | $2,120,287 | $0 |
| 2008 | $535,867 | $1,536,026 | $2,071,893 | $0 |
| 2007 | $525,360 | $1,505,908 | $2,031,268 | $0 |
Tax bill history
Coming soon. We'll show paid / unpaid / delinquent status per installment once tax bill ingestion is enabled.
Building permits
36 permits on file- Mar 27, 2026$8,000Buildingfiled
install (2) identical raceway with illuminated 17 channel letters signs: "haraz coffee house" facing street.
- Nov 15, 2024$4,000Buildingfiled
install raceway with electrical with 17 channel letters for "haraz coffee house" facing street for "sign b". share plans with 2024-1115-5119. for "haraz coffee house" business.
- Nov 15, 2024$4,000Buildingfiled
install raceway with electrical with 17 channel letters for "haraz coffee house " facing street for "sign a". ref to 2024-1115-5120. for "haraz coffee house".
- Jun 6, 2022$2,000Electricalcomplete
like for like fire alarm installation with sprinkler monitoring system
- Feb 16, 2022$24,185Buildingcomplete
like for like fire alarm installation with sprinkler monitoring system. install facu. smoke detectors, pull stations, new aes, monitor module.
- Dec 4, 2020$80,000Buildingcomplete
alteration of subsidewalk basement roof slab to install new accessible curb ramp
- Aug 5, 2019$8,500Buildingcancelled
provide and install new nitrogen infused coffee dispenser//nitrogen used in this project is 18 gallons, 6 kegs of 3 gallon each, it does not meet the criteria for operational permit per cfc table 105.6.11
- Sep 26, 2016$5,000Electricalissued
furnish and install one new pull station and a bell
- Jun 14, 2016$40,000Electricalcomplete
café t/i, including lighting, power and low voltage systems @ starbucks - 264 kearny street
- Jun 13, 2016—Plumbingcomplete
new plumbing and new fixtures for coffe shop
- May 11, 2016$156,800Buildingcomplete
starbucks: exterior install (n)reserve graphics @ window. interior: remove (e)&install (n)doors.remove(e)furniture & fixtures & provide(n).remove(e)&install(n)lights.remove(e)wall & floor finishes provde (n).provide(n)handsink @workroom,replace(e)mop,sink &(e)water heater,update (e)restrm finishes.
- Oct 22, 2013$500Electricalcomplete
installation of one (1) new receptacles at sales area inside existing starbucks store for future ues, 30amp #10 gauge awg cu extended from main panel, existing spare, pnla, space #42.
- Dec 4, 2012$800Electricalexpired
back room in existing starbucks coffee store: installing one new quad electrical outlet, 120 volt for future use, 1 new 20amp breaker circuit, 1/2" conduit size feeder
- Sep 21, 2010$1,500Plumbingcomplete
replace floor sink
- Sep 14, 2010$2,000Electricalcomplete
installation of (4) 20 amp - 120 voltage receptacles at counter area.
- Sep 10, 2010$20,000Buildingcomplete
interior ti to starbucks. demo vinyl walls, patch and finish with smooth paint. demo casework and countertops. new countertops with new casework and relocated casework. demo door and replace. demo interior door and replace. demo existing floor and refloor. no lighting,mech, fire
- Sep 15, 2007—Electricalcomplete
install duplex outlet using an existing circuit for lcd tv [scope of work does not include residential electric space heater installation.]
- Jan 13, 2006$7,500Buildingexpired
replace countertop and under counter cabinet and install new. 1 new refrigerator and microwave with 2 new dedicated outlets
- Apr 1, 2005$40,000Buildingcomplete
demo or remove some item shown in the plan, relocate case work, relocate plumbing, relocate
- Dec 7, 2004—Buildingissued
street space
About this record
Property data is sourced from the City and County of San Francisco's open data portals (parcels and assessor secured roll). This page is a public information summary and is not an official property record. For authoritative records, consult sfassessor.org or the SF Office of the Assessor-Recorder.