3839 Divisadero St
San Francisco, CA 94123·APN 0911002
Summary
3839 Divisadero Street, San Francisco, CA 94123 is a multi-family residential building in the Marina neighborhood, constructed in 1940 and zoned RM-3, containing 18 units across a 7,919 sqft lot with 18,762 sqft of building area; the property was last sold on September 23, 2022, and has a current total assessed value of $13,566,000, with $8,139,600 attributed to land and $5,426,400 to improvements; a notable building permit was completed on January 17, 2025, for otc alterations valued at $63,173, including a fire alarm system replacement and new horns to meet SFFC 2022 Section 1103.7.6.1 requirements.
Location
Property Details
- APN
- 0911002
- Year Built
- 1940
- Lot Area
- 7,919 sqft
- Building Area
- 18,762 sqft
- Units
- 18
- Use Code
- Multi-Family Residential
- Zoning
- RM-3
- Neighborhood
- Marina
- Last Sale
- Sep 23, 2022
County records
Tax history
18 years of history| Roll Year | Land | Improvements | Total Assessed | Exemptions |
|---|---|---|---|---|
| 2024 | $8,139,600 | $5,426,400 | $13,566,000 | $0 |
| 2023 | $7,980,000 | $5,320,000 | $13,300,000 | $0 |
| 2022 | $952,141 | $1,768,276 | $2,720,417 | $0 |
| 2021 | $933,472 | $1,733,604 | $2,667,076 | $0 |
| 2020 | $923,901 | $1,715,829 | $2,639,730 | $0 |
| 2019 | $905,786 | $1,682,186 | $2,587,972 | $0 |
| 2018 | $888,026 | $1,649,202 | $2,537,228 | $0 |
| 2017 | $870,614 | $1,616,865 | $2,487,479 | $0 |
| 2016 | $853,544 | $1,585,162 | $2,438,706 | $0 |
| 2015 | $840,723 | $1,561,352 | $2,402,075 | $0 |
| 2014 | — | — | — | $0 |
| 2013 | $820,530 | $1,523,850 | $2,344,380 | $0 |
| 2012 | $804,442 | $1,493,971 | $2,298,413 | $0 |
| 2011 | $788,669 | $1,464,678 | $2,253,347 | $0 |
| 2010 | $782,775 | $1,453,732 | $2,236,507 | $0 |
| 2009 | $784,635 | $1,457,186 | $2,241,821 | $0 |
| 2008 | $769,250 | $1,428,614 | $2,197,864 | $0 |
| 2007 | $754,167 | $1,400,602 | $2,154,769 | $0 |
Tax bill history
Coming soon. We'll show paid / unpaid / delinquent status per installment once tax bill ingestion is enabled.
Building permits
56 permits on file- Sep 26, 2024$63,173Buildingcomplete
fire alarm system replacement and new lf horns to mseet sffc 2022 sec 1103.7.6.1
- Sep 25, 2024$20,800ElectricalcompleteUnit 0
online electrical permit: 60 of buildings of 6 dwelling units or less. fire alarm system,panel,smoke,communicator,low frequency inside unit.
- May 17, 2024—PlumbingcompleteUnit 0
work category: 8p; replacement of domestic hot water boiler sn#d98n0049 with sn#d07gn0107
- Mar 15, 2023—Buildingcancelled
unit 203 convert e kitchen to study room, relocate kitchen, rehab e bath, install washer and dryer
- Jul 16, 2021$20,000ElectricalcompleteUnit 0
unit #101 provide and install a subpanel in the bedroom, 3 dedicated circuits for the kitchen, and 1 dedicated circuit for the bathroom.
- Jul 14, 2021—PlumbingcompleteUnit 0
work category: 1p; install rough and finish plumbing for remodel in unit#101 for bathroom and kitchen.
- Jun 18, 2021$24,000Buildingcomplete
apt 101: non-structural one kitchen, one bath remodel. replace kitchen base cabinets, 9' x 5' l-shaped. replace kit.counter top; shower surround marble. replace bathroom floor & wall tiles. replace shower pan. *plumbing and electrical work by other*
- Jun 16, 2021—Plumbingexpired
work category: 2pa; non structural one kitchen, one bath remodel replace kitchen base cabinets, 9'x5' l-shaped replace kit. counter top; shower surround marble replace bathroom floor & tiles replace shower pan *plumbing & electrical work by other*
- Jan 14, 2020$15,000ElectricalcompleteUnit 0
install 2 dedicated circuits for the kitchen counter plugs, install 1 dedicated circuit for the refrigerator, install 1 dedicated circuit for the bathroom. install a subpanel in the bedroom.
- Jan 3, 2020$2,500Plumbingcomplete
unit 306: shower drain and pan. leaking tear out, hot mop. water proofing.
- Dec 11, 2019—PlumbingcompleteUnit 0
work category: 1p; install rough and finish plumbing for remodel in unit #103.
- Oct 17, 2019$15,000ElectricalcompleteUnit 0
install 2 dedicated circuits for the kitchen counter plugs, install 1 dedicated circuit for the refrigerator, install 1 dedicated circuit for the bathroom. install a subpanel in the bedroom.
- Oct 2, 2019—PlumbingcompleteUnit 0
work category: 2pa; remodel in bathroom and kitchen for unit #202. install rough and finish plumbing.
- Aug 23, 2019$0Plumbingcomplete
units 103 & 202: (2) shower pans
- Aug 23, 2019$18,000Buildingcomplete
units 103 & 202: demolish kitchen counter, replace w/quartzonly, demolish bathroomn floor/wall tiles, replace w/margble, toilet, vanity, replace shower pan 5'x8'
- Jul 18, 2019—PlumbingcompleteUnit 0
work category: 1p; rough and finish plumbing for remodel in apt#102.
- Jul 18, 2019$18,000ElectricalcompleteUnit 0
install 2 dedicated circuits for the kitchen counter plugs, install 1 dedicated circuit for the refrigerator, install 1 dedicated circuit for the bathroom. install a subpanel in the bedroom.
- Jul 18, 2019$18,000ElectricalcompleteUnit 0
install 2 dedicated circuits for the kitchen counter plugs, install 1 dedicated circuit for the refrigerator, install 1 dedicated circuit for the bathroom. install a subpanel in the bedroom.
- Jul 11, 2019—PlumbingcompleteUnit 0
work category: 1p; rough and finish plumbing for remodel in apt#104.
- Jun 26, 2019$0Plumbingexpired
apt 102 & 104: shower pans, 1 per unit
About this record
Property data is sourced from the City and County of San Francisco's open data portals (parcels and assessor secured roll). This page is a public information summary and is not an official property record. For authoritative records, consult sfassessor.org or the SF Office of the Assessor-Recorder.