385 Eddy St
San Francisco, CA 94102·APN 0338018
Summary
Built in 1909, the Commercial Hotel at 385 Eddy St, San Francisco, CA 94102 sits on a 4,156 sqft lot within the Tenderloin neighborhood. The property, which contains two units and spans 25,144 sqft of building area, is zoned RC-4. It was last sold on December 20, 2019, and carries a 2024 total assessed value of $45,500,446. Notable permit activity includes a 1992 alteration involving unit count changes from 77 to 70.
Location
Property Details
- APN
- 0338018
- Year Built
- 1909
- Lot Area
- 4,156 sqft
- Building Area
- 25,144 sqft
- Units
- 2
- Use Code
- Commercial Hotel
- Zoning
- RC-4
- Neighborhood
- Tenderloin
- Last Sale
- Dec 20, 2019
County records
Tax history
18 years of history| Roll Year | Land | Improvements | Total Assessed | Exemptions |
|---|---|---|---|---|
| 2024 | $18,012,993 | $27,487,453 | $45,500,446 | $45,500,446 |
| 2023 | $17,659,798 | $26,948,484 | $44,608,282 | $44,608,282 |
| 2022 | $17,313,528 | $26,420,083 | $43,733,611 | $43,733,611 |
| 2021 | $16,974,048 | $13,674,592 | $30,648,640 | $30,648,640 |
| 2020 | $16,800,000 | $7,200,000 | $24,000,000 | $24,000,000 |
| 2019 | $378,884 | $995,556 | $1,391,136 | $1,391,136 |
| 2018 | $371,455 | $976,036 | $1,354,218 | $1,354,218 |
| 2017 | $364,172 | $956,899 | $1,371,462 | $1,371,462 |
| 2016 | $357,032 | $938,137 | $1,318,725 | $1,318,725 |
| 2015 | $351,670 | $924,046 | $1,289,187 | $1,289,187 |
| 2014 | — | — | — | $1,264,862 |
| 2013 | $343,224 | $901,852 | $1,260,199 | $1,260,199 |
| 2012 | $336,495 | $884,169 | $1,233,769 | $1,233,769 |
| 2011 | $329,898 | $866,833 | $1,242,471 | $1,242,471 |
| 2010 | $327,433 | $860,355 | $1,233,528 | $1,187,788 |
| 2009 | $328,211 | $862,399 | $1,236,350 | $1,190,610 |
| 2008 | $321,776 | $845,490 | $1,213,006 | $1,167,266 |
| 2007 | $315,467 | $828,912 | $1,190,119 | $1,144,379 |
Tax bill history
Coming soon. We'll show paid / unpaid / delinquent status per installment once tax bill ingestion is enabled.
Building permits
41 permits on file- Feb 20, 2026—Plumbingcomplete
work category: 2pb; house trap replacement
- May 20, 2022$1Buildingcomplete
reduction of scope for 201905029560. removal of fsd on level 2, 3, 4, 5 & 6. total of 2 fsd's removald on each floor/level.
- Apr 28, 2022$1,000Buildingissued
as-built fire alarm to 202010277521: add smoke detectors in electrical room in the basement & tie=in to slc loop
- Apr 1, 2022$1,500Electricalcomplete
install the mechanical control wiring and conduit at basement boiler room
- Mar 11, 2022$55,000Buildingcomplete
revision to permit 201905029560: added rear improvements by adding a deck (30" max.) above (e) grade and fence and replacing (e) door with accessible in-kind door.
- Jan 30, 2022—Plumbingcomplete
work category: 8p; remove existing domestic hot water boiler serial number # 770a8332091 replace with two new lochinvar boiler
- Dec 2, 2021$60,000Buildingcomplete
fire alarm installation on first half of building, new installation. installing facp, smoke aes radio, pull station and power supply. notification appliances will be installed throughout the building. monitor modules do the in waterflow and tamper. ref pa: 2019-0502-9560
- Sep 3, 2021—Plumbingcomplete
work category: 2pb; to file a permit extension. continue work for the plumbing permit: pw20200821995.
- Jun 10, 2021—Plumbingexpired
work category: 1p; remove existing boiler serial number # 770a8332091 replace with 2 new hot water boilers.
- Mar 31, 2021$17,000Plumbingcomplete
1 combined flue pipe with booster fan in basement for 2 domestic water heaters and 1 heating boiler to terminate to roof. permit 201905029560 ( building)
- Feb 21, 2021—Plumbingcomplete
work category: 4pb; install fire sprinkler system through out entire building per approved application #202010307893
- Feb 17, 2021$7,191Buildingcomplete
17 evacuation maps for basement, floors 1, 2, 3, 4, 5, 6 for fire review
- Feb 2, 2021$284,800Buildingcomplete
install (382) sprinklers throughout per nfpa 13. no underground work. ba# 2019-0502-9560.
- Jan 6, 2021—Plumbingcomplete
work category: 2pa; shower pan waterproofing for 5 bathrooms.
- Sep 13, 2020—Plumbingcomplete
work category: 8p; remove existing boiler serial number a83-12 steam boiler replace with one hydronic hot water heating boiler and install 82 units wall panel radiators, new piping and pvc flue piping
- Sep 11, 2020$25,000Electricalexpired
installing 44 cameras, 67 intercom jacks (cat5 or cat6), 67 tv jacks (coaxial cable) and 6 voice jacks (cat5 or cat6).
- Aug 21, 2020—Plumbingexpired
work category: 5p; install / replace plumbing system as per approved plans.
- Aug 17, 2020$120,000Electricalcomplete
new fire alarm installation
- Jul 31, 2020$0Electricalcomplete
basement level :install new sub panel .30 lights and 20 outlet . 1st level: rewire and install new 50 lights .60 outlet .power all havc unit .2nd to 6th floor : install and relocate 3 new outlet .one ceiling fan / light and each unit , replace all lighting fixture at common area .power the new elevator
- Jan 28, 2020$10,000Buildingcomplete
revision to 201905029560 n ew platfor lift change to 3 stops fro 2 stops to add a basement stop for maintenance access only
About this record
Property data is sourced from the City and County of San Francisco's open data portals (parcels and assessor secured roll). This page is a public information summary and is not an official property record. For authoritative records, consult sfassessor.org or the SF Office of the Assessor-Recorder.