665 03rd St
San Francisco, CA 94107·APN 3788041
Location
Property Details
- APN
- 3788041
- Year Built
- 1916
- Lot Area
- 24,320 sqft
- Building Area
- 134,445 sqft
- Units
- 0
- Use Code
- Commercial Office
- Zoning
- CMUO
- Neighborhood
- Financial District/South Beach
- Last Sale
- Apr 17, 1987
County records
Tax history
18 years of history| Roll Year | Land | Improvements | Total Assessed | Exemptions |
|---|---|---|---|---|
| 2024 | $3,491,570 | $12,119,588 | $15,611,158 | $0 |
| 2023 | $3,423,108 | $11,881,949 | $15,305,057 | $0 |
| 2022 | $3,355,988 | $11,648,970 | $15,004,958 | $0 |
| 2021 | $3,290,184 | $11,420,559 | $14,710,743 | $0 |
| 2020 | $3,256,447 | $11,303,455 | $14,559,902 | $0 |
| 2019 | $3,192,595 | $11,081,819 | $14,274,414 | $0 |
| 2018 | $3,129,995 | $10,864,528 | $13,994,523 | $0 |
| 2017 | $3,068,623 | $10,651,498 | $13,720,121 | $0 |
| 2016 | $3,008,454 | $10,442,645 | $13,451,099 | $0 |
| 2015 | $2,963,264 | $10,285,787 | $13,249,051 | $0 |
| 2014 | — | — | — | $0 |
| 2013 | $2,892,088 | $10,038,727 | $12,930,815 | $0 |
| 2012 | $2,835,380 | $9,841,889 | $12,677,269 | $0 |
| 2011 | $2,779,784 | $9,648,911 | $12,428,695 | $0 |
| 2010 | $2,759,009 | $9,576,798 | $12,335,807 | $0 |
| 2009 | $2,765,563 | $9,599,549 | $12,365,112 | $0 |
| 2008 | $2,711,336 | $9,411,323 | $12,122,659 | $0 |
| 2007 | $2,658,173 | $9,226,787 | $11,884,960 | $0 |
Tax bill history
Coming soon. We'll show paid / unpaid / delinquent status per installment once tax bill ingestion is enabled.
Building permits
169 permits on file- Sep 2, 2025$0Electricalcomplete
antenna cell site
- Jun 16, 2025$50,000Buildingcomplete
at&t modification: remove e) 9 antennas on slads, relocate n) steell framesto parapet wall, r/r/ 9 rru's, r/r e) panel w/ n) 200a ppc, rmove 4 e) cabinets, install n) vertiv 7100 scpp w/ 9 rectifiers & 8 converters, remove 3 strings, dela 145 ah batts. install 4 strings 190 ah, dc12 & 6648
- Mar 22, 2024$1Buildingcomplete
revision pa# 202206247101 existing hvac system and all associated support to remain and in operation
- Jan 30, 2024—Plumbingcomplete
work category: 5p; veryify removal of existing fuel storage tank and piping
- Jan 17, 2024$0Electricalcomplete
remove 600amps transfer switch and install a junction box
- Jan 12, 2024$1Buildingcomplete
revision to pa 202206247101. change in direction of the new concrete ramp inside the suite.
- Jun 5, 2023$550,000Buildingcomplete
complete suite vacation of an (e) telecommunication equipment faciliting in basement, removel of switch and transmission equipment, support equipment, fuel tank, emergency generator, transfer switches, a.c. units systems, etc.. the end state of the vacated suite shall be a white shell configuration.
- Jun 18, 2021$25,000Buildingwithdrawn
no antenna work. equipment room:remove(3)(e) at&t 206 rbs cabinets,remove(3)(e)at&t rrus-12b2,remove(24)(e) aty&t batteries.install (3)(n)at&trrus-4478 b5,install(3)(n) at&t rrus-4415 b25,install(1)(n)at&t xmu,install(1)(n)at&t vertiv indoor battery rack,install(12)(n) at&t gs ply 12v160ft batteries
- May 6, 2021$30,000Buildingcomplete
decommission of rally's offices, includes infilling openings in the original tenant demising partitions thus returning the 3rd fl to 3 independent suites. removal & slab infill of interconnecting communication stair between level 2 & 3 added by rally health in previous tenant improvement project.
- Jan 6, 2021$0Electricalcomplete
fire alarm system
- Oct 9, 2020$193,971Buildingissued
voluntary notification upgrade to (e) building fire alarm system. add (7) power supplies, (6) smoke detectors, (103) strobes only, (197) horn/strobes
- Mar 26, 2019$2,500Buildingissued
add 1 duct det at (e) fan. add 1 relay for fan shut down
- Mar 15, 2019$40,000Buildingcomplete
tenant improvement: new lighting & office furniture & title 24. 2nd fl. ref pa #201901039524.
- Mar 14, 2019$0Plumbingcanceled
work category: 5m; installation of new ductwork and registers to connect to existing unit.
- Mar 7, 2019$9,000Electricalcomplete
installation 31 workstations
- Mar 5, 2019$0Electricalcomplete
tenant improvement
- Mar 1, 2019—Plumbingcomplete
work category: 5p; 2nd floor rough in and trim waste, vent domestic cold water as needed for: one (1) toilet, one (1) lav, one instantaneous water heater
- Feb 15, 2019$0Plumbingcomplete
add relocate sprinklers in area of work to provide adequate fire sprinkler converse to new ti walls and ceilings layout on 2nd fl
- Feb 15, 2019$8,500Buildingcomplete
add/relocate sprinklers in area of work to provide adequate fire sprinkler coverage to new tenant improvement walls and ceiling layout on 2nd fl ref 201901039524.
- Feb 6, 2019$83,650Buildingcomplete
2nd fl - interior tenanat improvement of partial floor.