665 Geary St
San Francisco, CA 94102·APN 0318019
Location
Property Details
- APN
- 0318019
- Year Built
- 1923
- Lot Area
- 5,018 sqft
- Building Area
- 18,617 sqft
- Units
- 39
- Use Code
- Multi-Family Residential
- Zoning
- RC-4
- Neighborhood
- Tenderloin
- Last Sale
- Aug 26, 1995
County records
Pulls live deeds, mortgages, liens, and reconveyances from the SF Office of the Assessor-Recorder.
Tax history
18 years of history| Roll Year | Land | Improvements | Total Assessed | Exemptions |
|---|---|---|---|---|
| 2024 | $790,447 | $1,152,744 | $1,943,191 | $0 |
| 2023 | $774,949 | $1,130,142 | $1,905,091 | $0 |
| 2022 | $759,754 | $1,107,983 | $1,867,737 | $0 |
| 2021 | $744,857 | $1,086,258 | $1,831,115 | $0 |
| 2020 | $737,220 | $1,075,120 | $1,822,096 | $0 |
| 2019 | $722,765 | $1,054,040 | $1,776,805 | $0 |
| 2018 | $708,594 | $1,033,373 | $1,758,232 | $0 |
| 2017 | $694,700 | $1,013,111 | $1,724,076 | $0 |
| 2016 | $681,079 | $993,247 | $1,690,591 | $0 |
| 2015 | $670,849 | $978,328 | $1,665,442 | $0 |
| 2014 | — | — | — | $0 |
| 2013 | $654,736 | $954,830 | $1,625,831 | $0 |
| 2012 | $641,899 | $936,108 | $1,594,272 | $0 |
| 2011 | $629,313 | $917,753 | $1,563,331 | $0 |
| 2010 | $624,610 | $910,894 | $1,551,769 | $0 |
| 2009 | $626,094 | $913,058 | $1,555,417 | $0 |
| 2008 | $613,818 | $895,155 | $1,525,238 | $0 |
| 2007 | $601,783 | $877,603 | $1,495,651 | $0 |
Tax bill history
Coming soon. We'll show paid / unpaid / delinquent status per installment once tax bill ingestion is enabled.
Building permits
70 permits on file- Feb 21, 2024—PlumbingcompleteUnit 0
work category: 8p; replacement of a laars domestic hot water boiler serial number a97cc0069 with a laars mt2v0400 domestic hot water boiler..
- Apr 28, 2023$56,250Buildingcomplete
exterior concrete spalling repair of south, west & partial east facades including sealing & painting. no work at front facade.
- Mar 13, 2023$0PlumbingcompleteUnit 0
new fixtures in kitchen & bathroom.
- Mar 13, 2023$0ElectricalcompleteUnit 0
apt 405: remodel kitchen & bathroom. new fixtures. plugs lights, switches.
- Mar 13, 2023$37,500BuildingissuedUnit 0
apt 405: remove and dispose of capret and pad throughout unit (480sf). remove and dispolose of plaster and lathe from all walls and ceililng (1650) mold remediation. apt/unit refurbishment by others under pa 202303133541. to comply with nov202303894.
- Mar 13, 2023$55,000BuildingcompleteUnit 0
apt 405: remodel kitchen and bathroom. install new sheetrock, insulation flooring. isntall new cabinet and applicances. no change in wall or windows. mold remidiation as necessary. to comply with nov 202303894. interior by others under pa202303133544.
- Jul 25, 2022—PlumbingcompleteUnit 0
work category: 8p; installation of a replacement steam boiler serial number 211-12381-1296.
- Feb 3, 2022$0ElectricalcompleteUnit 0
add low frequency sounders in sleeping areas to comply with 1103.7.6.1 & upgrade fa systems like for like to be compatible & ul cert all onsite to be fast and efficient
- Nov 7, 2021$0ElectricalcompleteUnit 0
add low frequency sounders to all sleeping areas to comply with 1103.7.6.1. like for like replacement of devices and panel to comply with 1103.7.6.1
- Jun 17, 2021$0ElectricalcompleteUnit 0
install low frequency sounders to meet 75db at the pillow level per sffc 1103.7.6.1, panel and devices upgraded also.
- May 19, 2021$70,200Buildingcomplete
install low frequency sounders to meet 75db at the pillow per sffc section 1103.7.6.1 and replace the existing fire alarm control panel.
- Mar 8, 2018$0PlumbingcompleteUnit 0
unit #208: replace kitchen stove, and bathroom faucet/drain
- Mar 8, 2018$0ElectricalcompleteUnit 0
apt #208: replace (2) light fixtures and (1) smoke carbon detector
- Mar 8, 2018$14,000BuildingcompleteUnit 0
#208 - replace 1 vanity & faucet drain in bathroom place kitchen appliances. install (2 light fixtures. all items remain in same location
- Jan 22, 2018$21,000BuildingissuedUnit 0
unit 403: kitchen cabinets & counter tops. subcontract-plumbing-kitchen facuet & supply lines. maher na
- Apr 18, 2017—PlumbingcompleteUnit 0
work category: 1p; bathroom/kitchen remodel
- Apr 14, 2017$0ElectricalcompleteUnit 0
kitchen bathroom remodel, new light new switch new outlets
- Mar 20, 2017$28,000BuildingcompleteUnit 0
unit #202; remove & replace upper & lower kitchen cabinets & tiled kitchen floor. remove & replace bathroom vanity & medicine cabinet & tiled bathroom floor.
- Mar 1, 2016$0PlumbingcompleteUnit 0
bathroom toilet (low flow), sink, angle stops & supply lines, shower valve & fixtures, kitchen sink, faucet anglestops & supply lines
- Mar 1, 2016$0ElectricalcompleteUnit 0
unit 502, bathroom, occupancy sensor, gfi, high efficiency, lighting, living room, windy throughout, install pannel, high efficiency lighting, kitchen: gfi, high efficiency lighting, 2 lts, 4 switches, 8 recepts, 3 smoke detects, 1 ranges
About this record
Property data is sourced from the City and County of San Francisco's open data portals (parcels and assessor secured roll). This page is a public information summary and is not an official property record. For authoritative records, consult sfassessor.org or the SF Office of the Assessor-Recorder.