666 Bay St
San Francisco, CA 94133·APN 0028006B
Summary
Built in 1929, the three-unit Multi-Family Residential property at 666 Bay St, San Francisco, CA 94133 sits within the Russian Hill neighborhood. The parcel features a lot size of 1,912 sqft and a building size of 3,316 sqft under RTO-C zoning. Its current total assessed value is $1,402,746, comprising $929,602 for land and $473,144 for improvements. The property last sold on October 23, 2012, and received a building alteration permit in December 2018 with a valuation of $20,000.
Location
Property Details
- APN
- 0028006B
- Year Built
- 1929
- Lot Area
- 1,912 sqft
- Building Area
- 3,316 sqft
- Units
- 3
- Use Code
- Multi-Family Residential
- Zoning
- RTO-C
- Neighborhood
- Russian Hill
- Last Sale
- Oct 23, 2012
- Owner-occupied
- Likely
County records
Tax history
18 years of history| Roll Year | Land | Improvements | Total Assessed | Exemptions |
|---|---|---|---|---|
| 2024 | $929,602 | $473,144 | $1,402,746 | $7,000 |
| 2023 | $911,375 | $463,869 | $1,375,244 | $7,000 |
| 2022 | $893,505 | $454,775 | $1,348,280 | $7,000 |
| 2021 | $875,986 | $445,859 | $1,321,845 | $7,000 |
| 2020 | $867,004 | $441,289 | $1,308,293 | $7,000 |
| 2019 | $850,004 | $432,637 | $1,282,641 | $7,000 |
| 2018 | $833,338 | $404,547 | $1,237,885 | $7,000 |
| 2017 | $816,999 | $396,616 | $1,213,615 | $7,000 |
| 2016 | $800,980 | $388,840 | $1,189,820 | $7,000 |
| 2015 | $788,949 | $338,121 | $1,127,070 | $7,000 |
| 2014 | — | — | — | $7,000 |
| 2013 | $770,000 | $330,000 | $1,100,000 | $7,000 |
| 2012 | $324,167 | $370,847 | $695,014 | $0 |
| 2011 | $317,811 | $363,576 | $681,387 | $0 |
| 2010 | $315,437 | $360,860 | $676,297 | $0 |
| 2009 | $316,186 | $361,717 | $677,903 | $0 |
| 2008 | $309,987 | $354,625 | $664,612 | $0 |
| 2007 | $303,909 | $347,672 | $651,581 | $0 |
Tax bill history
Coming soon. We'll show paid / unpaid / delinquent status per installment once tax bill ingestion is enabled.
Building permits
30 permits on file- Dec 4, 2018$3,500Plumbingcomplete
work category: 1m; reconnect the existing gas furnace to a new location. flue and ducting.
- Nov 26, 2018$800Electricalcomplete
install new outlets in storage room. re locate furnace circuit to new location in existing storage room.relocate existing light switch.
- Nov 19, 2018—Plumbingcomplete
work category: 1p; move gas line 5ft for furnace
- Nov 15, 2018$20,000Buildingcomplete
unit a: add drywall to existing storage room, move furnace and add power outlets.
- Sep 21, 2017$8,000Buildingcomplete
replace 9 existing wood windows in rear with new vinyl windows, not visible from street. no rough opening changes. u-factor shall not exceed 0.32.
- Aug 5, 2014$14,000Buildingcomplete
re-roofing - compliance with ord 155-13 not required
- Jun 19, 2014$10,000BuildingcompleteUnit 0
comply with nov# 201384395 (unsafe bldg. complaint), removal of (e) conc. stair, (n) p.t. or redwood stair from unit to grade (replacement), upgrade of (e) retaining wall. n/a ordinance #155-13
- Oct 9, 2013$8,000BuildingcancelledUnit 0
install new roof deck
- Aug 6, 2013$25,000BuildingcompleteUnit 0
(n) conc. infill wall at (e) basement stairs for backfill. (n) conc. slab over (n) & (e) compact fill @ 1/f., (n) floor framing to replace (e) damaged & dry rot framing @ 1/f.
- Aug 5, 2013$0PlumbingcompleteUnit 0
top floor: bathroom, kitchen, remodel, install tankless water heater, washer & dryer.
- Aug 5, 2013$0Electricalcomplete
this work is for the upper unit. rewire plugs and lights throughout unit. rewire remodeled kitchen and baths.
- Aug 2, 2013$12,961Buildingcomplete
replace 15 windows, size for size, windows visible from the street with marvin woodclad windows and windows not visible from the street with vinly simonton windows.
- Jul 1, 2013$44,000Buildingcomplete
kitchen remodel, new fixtures, cabinets, upgrade electrical, new surface, etc. bathroom remodel, new fixtures, tile, upgrade electrical etc. toilet room remodel, new toilet and sink, tile, upgrade electrical etc. laundry room remodel, new fixtures, cabinets, upgrades electrcial etc, new eletrical
- Jun 26, 2013$0Electricalcomplete
kitchen plugs, lighting and new circuits, bath, hall, bedroom, added plugs, rewired plugs and lights and ran new circuits. new circuit plugs and lighting in laundry.
- Jun 20, 2013$12,000PlumbingcompleteUnit 0
work category: 2m ; installing three new gas furnaces for three units. three flue pipes. condensation drain. new ducting for three heating.vents.
- May 20, 2013$0PlumbingcompleteUnit 0
remodel bathroom & kitchen, install tankless water heater.
- May 3, 2013$9,500Buildingcomplete
revision to application 201211154345 - bathroom remodel with new fixtures, surfaces etc
- Apr 3, 2013$15,000Buildingcomplete
reinforce extg foundation wall at n.w. corner of the building with new 18"x14" reinforced concrete beam. fasten n.g. corner of extg retaining wall n.e. corner with 2-a wide x 3/8" galv steel brackets
- Mar 5, 2013$4,500BuildingcompleteUnit 0
replace 4 windows size ofr size visable from the street in kind with marvin wood clad windows.
- Feb 21, 2013$7,500BuildingcompleteUnit 0
revision to pa# 201301077368. new ceiling, hall, bathrooms, bedrooms, new drywall on some interior walls. insulation on open walls and ceilings. upgrade laundry and water closet/toilet room.
About this record
Property data is sourced from the City and County of San Francisco's open data portals (parcels and assessor secured roll). This page is a public information summary and is not an official property record. For authoritative records, consult sfassessor.org or the SF Office of the Assessor-Recorder.